InterContinental Hotel
Previous Next The complete Refurbishment of Hong Kong’s largest Ballroom and Stairwell area. Works consisted of the complete demolition and removal of existing finishes and the provision of new specialty Ceilings, Lighting, Floor and Wall Finishes, Doors, Frames and Ironmongery, Joinery and Furniture Fixtures & Fittings. Work was carried out to a fast track schedule […]
WPP Group
Previous Next S&techs was engaged by WPP to provide high end Fit-Out services for their Hong Kong Campus facility including interconnecting stairs to a fast-track schedule and a high level of finish. Due to multiple internal Clients, the project involved close coordination and collaboration with the Client & Consultant Team. Stringent budget constraints required S&techs […]
Willis Towers Watson
Previous Next The project consists of the fit-out of new offices for Willis Towers Watson in multiple APAC locations.S&techs was engaged by Willis Towers Watson in the Design Phase of the project and was able to significantly contribute to Buildability Studies, Budgeting, Value Engineering and Planning in the early stages of each project. Client : […]
Bupa
Previous Next S&techs was engaged by Bupa to construct their 70,000sf offices over (2) floors plus interconnecting stairway at the Quayside. S&techs was engaged initially to lead an extensive Value Engineering exercise with Colliers and the appointed consultants to achieve the Clients budget/ capex. Once construction started S&techs managed the construction on site as well […]
Avolon
Previous Next S&techs was engaged by Avolon to provide Construction Manament / Main Contracting Services for their offices in Hong Kong and Singapore. Highlights included: • Construction Manager / Main Contractor• Engineering Design• Design Development locally• Close collaboration with Internationally based Client and Designer• Fast Track Schedule• Various Types of Services – Pre-Construction – Estimating – […]
Alphadyne Asset Management
Previous Next S&techs was engaged by Alphadyne Asset Management to design and build their offices in Hong Kong and Singapore. HIghlights included: • Close collaboration with Internationally based Client and Consultants• High attention to detail & quality• Management & Coordination of all local procurement and Client Direct Vendors• Representing the Client with Building Management interface locally […]
Swire Beverages
Previous Next • Meeting / Conference Rooms with Video Conferencing Capabilities• File / Storage Room with roller storage system & associated floor strengthening• Breakout Area• Meeting and Discussion Rooms at perimeter and core areas• Open Plan Office areas• Copy / Fax Areas• Storage / Coat Closets• Server Room• Open and Enclosed Pantry• Multi-Function Space• Community […]
Microsoft
Previous Next S&techs was engaged by Microsoft to re-stack their offices at Cyberport 2, Hong Kong. The area comprises approximately 60,000sf of space over three floors and works were carried out in three phases. Client : Sector : Technology Location: Hong Kong Size: 60,000sf Role: Main Contractor Project Manager: Arcadis Architect: M Moser Before After […]
Latham Watkins
Previous Next The project consisted of the Fit-Out of three (3) floors at the Grade ‘A’ Exchange Square Building Complex including an interconnecting staircase between all floors. Client : Sector : Law Firms Location: Hong Kong Size: 40,000 sf Role: Main Contractor Architect: Gensler Consulting Engineer: Pentac Before After Proudly Present, Other Related Projects Industrial […]
Freshfields Bruckhaus Deringer
Previous Next The phased Renovation of three (3) office floors and a new office fit-out on one (1) in the Grade ‘A’ at Exchange Square Building Complex including an Interconnecting Staircase between three (3) floors. Client : Sector : Commercial Location: Hong Kong Size: 47,000 sf Role: Main Contractor Project Manager: Confluence Architect: M Moser […]