This project comprised the fitout of a 5,000 sf data hall at 720KW critical load. It included the installation and commissioning of the following:
• RDUs
• Cabling for power supply from the PDUs to RDUs and from RDUs to server racks.
• Installation of 4 Pole Static Transfer Switch with BMS
• Ductwork for telecoms and fibre
• Overhead cable basket for structured cabling
Client :
Softlayer
Location:
Hong Kong
Size:
5,000 sf
Role:
Design & Build Contractor